Unit 216, Cambridge Science Park

Cambridge

Architect: Broadway Malyan
Main Contractor: Hutton Construction
Installer: Elliston Steady & Hawes (Aluminium)

Kawneer’s aluminium AA®100 zone-drained curtain wall and thermally superior AA®720 entrance doors feature on all elevations of Unit 216 at the UK’s leading science park, while AA®190 TB severe-duty doors have been used on the main entrance. The unit was taken back to a concrete shell and rebuilt with a brick and glazed façade by main contractor Hutton Construction and is now the new home for Amgen, one of the world’s largest independent biotechnology companies.

For more information about this project download the full case study PDF

Download